The effect of floor drains on the fire protection of joists must be considered during installation.
For concrete floors, the concrete cover layer under the floor drain should be about 70 mm to ensure fire EI 60 without further fire tests or thermal conductivity calculations. This can be achieved with a 220 mm concrete floor and 24 mm floating filler, or 240 mm concrete.
Contact us for solutions and further information.